Man-watch Required
Man-watch Required
The Inspection Podcast
Piping life Cycle "Inspection Program Set-up, monitoring and Repair"- Part 3
1 hour 19 minutes Posted Jul 20, 2020 at 7:00 am.
0:00
1:19:27
Download MP3
Show notes

In part 3 of their piping mini series Frank goes crossed-eyed during his attempt at an intro, and mixes up his process flow diagrams with piping and instrument diagrams.  

They start off with a "quick" recap of Part 2, and jump right into piping circuitization, possible locations to start and end your piping circuits. A few key items to check while completing your inspections and hint at a few resources to check out if process information is slim to help you get your corrosion surveys started. 

They also touch on how to create your circuit drawings and the importance of keeping them updated.

Our website is finally up! Check us out at
https://www.manwatchrequired.com/

We are also on instagram and linked-in
https://www.instagram.com/manwatch_required
www.linkedin.com/in/man-watch-required