Man-watch Required
Man-watch Required
The Inspection Podcast
Jul 6, 2020 · 1 hr 11 min

Piping life Cycle "Installation and starting your Inspection Program"- Part 2

MP3

In this episode Scott nearly faints trying a new opener, and the boys continue on with their piping life-cycle series.

The episode starts with a re-cap of some acronyms, owner-user requirements, inspection company requirements and clarification of some important points made in episode one.

They awkwardly try and explain fluid services in ASME B31.3 / API 570 and how they fit into the ABSA (Local Jursticitional) requirements. They also go through some things to check during your installation inspections and get caught in a couple rabbit holes along the way, which leads to an episode 3 for piping inspection and repair.

Enjoy the listen.

Follow us on Instagram:
https://www.instagram.com/manwatch_required
LinkedIn
https://www.linkedin.com/in/man-watch-required-b864361b0/

This podcast uses Buzzsprout for stats. What this means Episodes play from the podcast's own servers, unmodified. Not affiliated with Podbay.