The Future is Electric
The Future is Electric
Michael Barnard
TFIE039 CT014: Joi Scientific’s perpetual hydrogen scheme predictably falls apart
13 minutes Posted Dec 30, 2019 at 6:44 pm.
0:00
13:44
Download MP3
Show notes

New Brunswick Power and through them the rate payers of the province of New Brunswick are out at minimum $13 million spent on an obviously non-viable technology. Their due diligence failed. This is a podcast version of the article of the same name on the TFIE Medium publication.