Static Bursts
Static Bursts
Staticworx
Jun 16, 2019 · 3 min

Installing ESD Flooring in a 24/7 facility without disrupting operations

MP3
Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it's important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces - without adhesive or chemicals and with neither downtime nor disruption.

This podcast uses Blubrry for stats and dynamic audio and Blubrry for stats. What this means Episodes play from the podcast's own servers, unmodified. Not affiliated with Podbay.