Episode 13: Target Value Design
Contractors usually start target value design with the construction budget. By then, the target has already been set somewhere upstream by land, density, financing, operating costs, and the returns a project has to hit to get built at all. In this episode, we follow the number back to where it starts.
Justin Ballantine returns to the show from Mill Creek Residential, a vertically integrated developer, builder, and operator of multifamily communities nationwide. He spent nearly a decade in pre-con at Callahan Construction, a third-party GC, before moving to Mill Creek. That gives him a view from both sides of the table. He walks Troy and Trey through how a project's target is actually born and how Mill Creek is working toward target value design and integrated project delivery. He also explains why the phrase he most wants removed from design meetings is "if it works with Justin's budget."
In this episode:
- How the pro forma drives the target: max density, unit mix, parking, and return on cost before a site plan even exists
- Why target value design is not target cost design, and how developers define value differently than contractors do
- The biggest cost levers in today's market: site conditions, soils export, trucking, and municipal pressure on truck trips
- How energy codes like the Massachusetts stretch energy code and passive house requirements set a cost baseline before the "pretty stuff"
- The MacLeamy curve and why 80% of project cost is set in the first 20% of design
- Set based design and cost buckets: treating the entire facade as one $10M bucket and flexing the mix of fiber cement, metal panel, and brick inside it
- Balancing form and function so one system, like triple-glazed windows, doesn't consume the whole bucket
- Continuous estimating, design phase pull plans, and moving from reactive value engineering to proactive decisions
- The real barriers to IPD: contracts, pre-con fees for trade partners, and getting investors to see cost as value
- Why vertical integration and a consistent core of design partners make value decisions easier
- A reworked Fast Five, including whether a bad number or a slow decision is more dangerous and the trade Justin wishes came in earlier
The best projects aren't the ones that hit the number. They're the ones where everyone at the table can see the number, trusts it, and makes decisions in meetings instead of months.
Proper Precon Podcast is powered by Ediphi. Catch every episode at properprecon.com, or subscribe on YouTube, Spotify, or Apple Podcasts. Share it with your favorite builder, trade partner, developer, or architect.