Marine Infrastructure Live
Marine Infrastructure Live
QuakeWrap
5 - Blueprint Breakdown: Uncovering Design Dilemmas and Cutting Costs in Seawall Repair Projects
26 minutes Posted Dec 11, 2023 at 2:34 pm.
0:00
26:15
Download MP3
Show notes

Live from the Dock Expo in Nashville, TN. In this episode Mo reviews a design he received for the repair of a severely corroded seawall, comparing it to a design alternative using SPiRe Plus panels. Mo digs into the current designs' logistical challenges, excessive welding and corrosion concerns. Then he reviews how the SPiRe Plus panels help to: decrease logisitcal issues due to their light weight, provide an easy install, reduce maintenance, and reduce costs.