Live Long Lead Well
Live Long Lead Well
Dr. Mark T. Jones Sr.
Sonship in Servitude
54 minutes Posted Jul 5, 2024 at 11:21 pm.
0:00
54:46
Download MP3
Show notes
John
Then answered Jesus and said unto them, Verily, verily, I
say unto you, The Son can do nothing of himself, but what he seeth the Father do: for what things soever he doeth, these also doeth the Son likewise.