Show notes
In this episode Devin and Uriel talk about some of the improvments they made over the past week and the thinking behind each. 8 Lean wastes - Over production, Over Processing, Excess inventory, Defects, Transportation, Wasted motion, Waiting, Wasted human potential Some of the improvements include: - Flip up clamp for longer straps at Austere MFG- Updated Work Order slips to highlight need for material certs and inspection reports- Pull tester for load rating verification- Successful use of G54.2 probing and code output- Kanban 3D printed production tooling- All shop lighting on one switchPlease follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses. Thanks for listening! Please drop us a note with any and all feedback! If you have parts you need machined, reach out to [email protected] and follow on Instagram www.instagram.com/lichen_mfg If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing

