Incremental:
The Continuous Improvement Podcast
Incremental: The Continuous Improvement Podcast
Devin Bodony and Uriel Eisen
Episode 34. Assembly Jig Issues, Optimize for learning
59 minutes Posted Jun 9, 2023 at 8:57 am.
0:00
59:03
Download MP3
Show notes

In this episode Devin and Uriel talk about some of the improvments they made over the past week and the thinking behind each.
8 Lean wastes - Over production, Over Processing, Excess inventory, Defects, Transportation, Wasted motion, Waiting, Wasted human potential
Some of the improvements include:
- Assembly jig issues and modifications
- Job tracking changes to address missed shipments
- Sewing Jig feedback
- Finished our new tool tag implementation
- New drop off routine for automated part unloading
- Finished trunnion table machining
- Austere bought a Freddy!
Please follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses. Thanks for listening! Please drop us a note with any and all feedback!
If you have parts you need machined, reach out to [email protected] and follow on Instagram www.instagram.com/lichen_mfg If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing