Efficiency and Reliability Audio Case Studies
Efficiency and Reliability Audio Case Studies
IGS
EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0
6 minutes Posted Feb 2, 2024 at 1:24 pm.
0:00
6:44
Download MP3
Show notes

In this audio case study, we'll talk about the changing maintenance strategy of the power plant operating two Circulating Fluidized Bed boilers. In 2015, they required 500 tube repairs across their units, leading to severe production disruptions. We'll explain why their boiler reliability was compromised and what they learned from it.