Concrete Logic
Concrete Logic
Seth Tandett
EP #091: Rethinking Time Limits on Concrete
44 minutes Posted Jul 9, 2024 at 9:00 am.
Introduction and Background
The Change from 90 Minutes to 120 Minutes
The History and Justification of the 90-Minute Time Limit
Rethinking Temperature Specifications
Prioritizing Practicality and Sustainability
The Responsibility of Concrete Producers
Introduction and Background
The Change from 90 Minutes to 120 Minutes
The History and Justification of the 90-Minute Time Limit
Rethinking Temperature Specifications
Prioritizing Practicality and Sustainability
The Responsibility of Concrete Producers   *** Did you learn something from this episode? If so,…
0:00
44:07
Download MP3
Show notes
In this episode, Seth interviews Rich Szecsy, an executive
in the concrete supply industry. They discuss the recent change in the batch time for concrete from 90 minutes to 120 minutes.
Rich explains the history behind the 90-minute time limit and the lack of scientific justification for it. He emphasizes the importance of considering the practicality and
sustainability of construction methods. They also touch on the topic of temperature specifications for concrete and the need for a more nuanced approach.
Takeaways
The 90-minute time limit for concrete batch time
has been in place since the 1930s, but there is no scientific justification for it.
The recent change to a purchaser-determined batch
time allows for more flexibility and practicality in construction projects.
Temperature specifications for concrete should
be based on the specific conditions and requirements of each project, rather
than arbitrary limits.
The focus should be on building something and
finding the most efficient and sustainable methods to achieve that goal.
The responsibility of a concrete producer is to
the purchaser, and specifications should be tailored to meet their needs and preferences.
Chapters
 
***
Did you learn something from this episode? If so, please
consider donating to the show to help us continue to provide high-quality
content for the concrete industry.
Donate here: https://www.concretelogicpodcast.com/support/⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
*** 
Episode References
Guest: Rich Szecsy | [email protected]
Guest Website:⁠ https://www.linkedin.com/in/rich-s-szecsy-phd-pe-faci-8724992/
 
Producers: Jodi Tandett
Donate & Become a Producer: ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.concretelogicpodcast.com/support/⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
 
Music: Mike Dunton | ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.mikeduntonmusic.com⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ | ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠[email protected]⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ | Instagram ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠@Mike_Dunton⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
Host: Seth Tandett, ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠[email protected]⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
Host LinkedIn: ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.linkedin.com/in/seth-tandett/⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
Website: ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.concretelogicpodcast.com/⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠
LinkedIn: ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.linkedin.com/company/concrete-logic-podcast