
Why Working Prototypes Fail in Production, Part 2: The Failure Patterns and Fixes
Why do some working prototypes still fail when they reach production?This is episode 329 and the second part of our discussion on this topic, and Adrian and Paul move from the general prototype-to-production gap into real-world failure patterns that can derail a product launch. They look at 3 common scenarios:Component swaps made for cost reductionFirmware clean-up before releaseAnd transferring production from one factory to anotherYou’ll hear why a cheaper component that looks identical on paper can still cause major problems, why every firmware change needs to be tested and documented, and why a factory transfer should never be treated as a simple handover.The episode also explains how a structured NPI/MPI process, production-representative builds, configuration control, phase gates, pilot runs, and factory process audits help reduce the risk of production failure.The key message: a prototype proves the concept, but production proves the process. Before approving production, you need to know exactly what was validated, what configuration it applied to, and what has changed since. TIMESTAMPS Related contentGet help with your project from Sofeast. These services cover the topics discussed today:New Product Introduction SupportNPI Deliverables ReviewDFM Review for Manufacturing in AsiaReliability Engineering & TestingProcess Management Audit (PMA)First Article Inspection Get in touch with Sofeast Connect with us on LinkedIn Contact us via Sofeast's contact page Subscribe to our YouTube channel Prefer Facebook? Check us out on FB
This podcast uses Podbean for stats and dynamic audio. What this means Timestamps may be slightly off because ads are inserted dynamically. Episodes play from the podcast's own servers, unmodified. Not affiliated with Podbay.
